MUNICIPAL CORPORATION, ELURU
NOTE ON MUNICIPAL ACTIVITIES IN MUNICIPAL CORPORATIONS
Profile of the City:
- Eluru Municipal Corporation is the district headquarters of West Godavari District of Andhra Pradesh and is located 160-14' north latitude and 81°- 05' eastern longitude.
The population of the city is 2.17 lakhs as per 2011 census and present population is around 2.50 lakhs. The Extent of the city is 11.52 sq.km, with 50 Municipal Divisions.
Demography : As per the census the population of the city for the years 1991,2001,2011 is2.13 lakhs, 2.16 lakhs, 2.18 lakhs respectively.
- The City had fluctuation in the growth rate since decades due to many factors of influence. The present growth rate of the city is showing negative trend. The fluctuating growth rate is indicative of the strong linkages the city has with its hinterlands.
Topography: The town has bowl shaped topography. The contour ranges from +18 M to +10.5 M.
The city is located with Godavari Western canal, Krishna Eastern canal and Tammileru river.
- Connectivity: Road: National Highway NH5 connects Eluru to Chennai in the south and Kolkata in the north. There are buses for every 15 minutes to Vijayawada, the new Capital Region.
- Rail: The broad-gauge railway line on the Eastern Coast of the country connecting Chennai to Kolkata passes through the town.
Air: Gannavaram is the nearest airport (40km).
Infrastructure Information:
Water Supply:
|
Source of water |
Godavari Canal & |
|
26Nos. |
|
|
Total Service Reservoirs |
18,310 KL |
|
||
|
supply |
Krishna Canal |
|
||
|
|
capacity. |
|
||
|
|
|
|
|
|
|
Total Storage of SS |
3680 ML |
Frequency of Supply |
Twice in a day |
|
|
Tanks |
|
|
||
|
|
|
|
|
|
|
Treatment Plants |
44.82MLD |
Supply Hours per day |
Two hours. |
|
|
|
|
|
|
|
|
Present Daily Supply |
31MLD |
No. of House Holds |
55014 no’s |
|
|
|
|
|
|
|
|
Per capita supply |
135 lpcd |
No. of assessments |
38454 no’s |
|
|
|
|
|
|
|
|
No. of Tap connections (Gen.13,227 no’s+BPL. 11,176 no’s) |
24,403 NO’S |
|
||
|
|
|
|
|
|
- The Corporation has storage capacity and contemplated measures to supply water twice a day during ensuring summer.
|
ROADS |
|
DRAINS |
|
||
|
|
|
|
|
|
|
|
Type of Roads |
|
Length in K.M. |
Type of Drains |
|
Length in K.M. |
|
|
|
|
|
|
|
|
B.T.Roads |
|
40.96 |
C.C.Drains |
|
228.44 |
|
|
|
|
|
|
|
|
C.C.Roads |
|
143.45 |
Storm Water Drains |
|
6.8 |
|
|
|
|
|
|
|
|
W.B.M.Roads |
|
20 |
Cutcha Drains |
|
67.63 |
|
|
|
|
|
|
|
|
Cutcha Roads |
|
6.76 |
- |
|
- |
|
|
|
|
|
|
|
|
Total |
|
211.17 |
- |
|
302.87 |
|
|
|
|
|
|
|
Energy Conservation:
- Conventional SV/MHO lamps and 40Watt tube lights has been replaced with LED lamps by M/s EESL and savings of 14.85 lakh KW per annum is being realized for achieving a savings of 115.80
Lakhs.
• Energy and Water Audit Study is taken up by M/s Tata Consulting Engineers Ltd and is in process.
Improvement of Revenue:
- Eluru Municipal Corporation made special efforts towards collection of Property Tax by the way of issuing legal notices to the defaulters (property tax) beyond three years and issued 436 No’s of legal notices to the tax payers and for total amount of Rs. 1.99 crores involved and out of that 121 assesses were paid entire tax due and collected Rs. 30.22 lakhs.
- Further mutation charges were revised in the month of July’2015 as Rs. 300/- for every one lakh of registration value of land & buildings for house tax and vacant land tax assessments and mutation charges collected are Rs. 16.00 lakhs during current financial year
STATEMENT SHOWING YEAR WISE INCREASE OF PROPERTY TAX
ASSESSMENTS AND DEMAND (in lakhs)
|
Year |
Number of |
Demand |
Collection |
|
|
Assessments |
|
|
|
|
|
|
|
|
2011-12 |
32288 |
812.12 |
782.22 |
|
|
|
|
|
|
2012-13 |
34472 |
1035.4 |
860.91 |
|
|
|
|
|
|
2013-14 |
34856 |
1086.94 |
974.4 |
|
|
|
|
|
|
2014-15 |
37754 |
1059.1 |
1031.88 |
|
|
|
|
|
|
2015-16 |
38778 |
1637.67 |
1019.3 |
|
|
|
|
|
COLLECTION STATUS OF LAST 5 YEARS (in Lakhs)
|
Sl.No. |
Description |
2011-12 |
2012-13 |
2013-14 |
2014-15 |
2015-16 up to |
|
|
09.03.2016 |
|
||||||
|
|
|
|
|
|
|
|
|
|
1 |
Property Tax |
782.22 |
902.79 |
1050.87 |
1164.49 |
1290.00 |
|
|
|
|
|
|
|
|
|
|
|
2 |
Water Charges |
169.3 |
141.97 |
208.64 |
235 |
180.00 |
|
|
|
|
|
|
|
|
|
|
|
3 |
Market & |
31.3 |
46.2 |
26.2 |
21.12 |
45.00 |
|
|
Slaughter Houses |
|
||||||
|
|
|
|
|
|
|
|
|
|
4 |
Shop Rents |
144.86 |
124.25 |
126.15 |
104.92 |
163.00 |
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL: |
1127.68 |
1215.21 |
1411.86 |
1525.53 |
1678.00 |
|
|
|
|
|
|
|
|
|
|
Statement of Accounts (in Lakhs)
|
YEAR |
RECEIPTS |
EXPENDITURE |
|
|
|
|
|
2012-13 |
3150.65 |
3129.53 |
|
|
|
|
|
2013-14 |
3318.88 |
2756.3 |
|
|
|
|
|
2014-15 |
4343.17 |
2881.37 |
|
|
|
|
Double Entry Accrual Based Accounting System has been implemented.
Provident Fund statements are given to Teaching & Non Teaching staff upto 2014-15.
Audit upto year 2013-14 completed
Annual Accounts for the year 2014-15 completed. Audit
Status of ongoing developmental activities:
- Eluru Municipal Corporation has under taken development works with Government grants & Internal funds for providing essential infrastructure such as Water Supply , Roads and Colony Drains.
- Major Storm Water Drains were taken up under 13th FC grant for proper drainage and preventing insanitary conditions
Physical Progress
|
[ |
No.of works sanctioned |
136 |
|
[ |
No.of works Completed |
75 |
|
[ |
No.of works in progress |
61 |
Financial Progress
|
[ |
13th Finance commission |
Rs. 7.63 Cr |
|
|
[ |
Non Plan Grant |
Rs. 3.77 Cr |
|
|
[ |
Plans grant (SC SP) |
Rs. 5.07 Cr |
|
|
[ |
Plans grant (General) |
Rs. |
0.17 Cr |
|
[ |
Swachh Bharat |
Rs. |
0.83 Cr |
|
[ |
Municipal Funds (General) |
Rs. |
6.00 Cr |
|
[ |
Municipal Funds (SC Areas) |
Rs. |
0.81 Cr |
|
|
Total |
Rs. |
24.28 Cr |
ACITIVITES:
Smart City:
- Hon’ble Chief Minister has endorsed M/s Siemens Consortium for finding Technological Innovative Solutions for Eluru City.
- The Consortium Team of 10 renowned companies have visited the City and had consultations with the District Collector, District & Corporation Officials and Public Representatives.
- The basic data, relevant information DPRs pertaining to Storm Water Drainage, Sewerage and Traffic Study report City Development Plan etc were shared with the Consortium Team.
- The Consortium Team has visited the city twice and regularly participating in Teleconference with District Collector and other Officials.
- The Consortium Team is scheduled to visit the city on 10th & 11th Mar’2016 for having discussion regarding proposals. The topics and their status is has follow
SMART CITY SOLUTIONS by SIEMENS CONSORTIUM
|
TOPIC |
POINTS OF CONCERN |
|
|
Present Status |
|
|
|
|
Next Steps |
|
|
|
|
||||||
|
|
/ NEEDS |
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
Water , Waste Water and Storm water |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
Reduce NRW |
Work is progressing apace. Most required |
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
Increase |
|
data is available. Can make do with logical |
|
|
|
|
|
|
|
|
|
|
||||||
|
Water distribution |
distribution |
assumptions so far. Working with Siemens |
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
Introduce SMART |
Water group on metering / automation |
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
element |
|
elements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
Retrofit |
defunct |
Work |
is |
progressing apace. Most |
required |
Decentralized |
STPs |
at |
4 |
|
||||||||
|
|
system |
Optimise |
|
||||||||||||||||
|
|
data is available. Can make do with logical |
locations |
as |
envisigned |
in |
|
|||||||||||||
|
Sewerage Process |
existing |
DPR |
|
||||||||||||||||
|
assumptions so |
far. Will require |
info on |
DPR |
may |
be |
provided. |
|
||||||||||||
|
|
Introduce |
SMART |
|
||||||||||||||||
|
|
location of STP, Area available etc. |
|
Locations maps to be sent |
|
|||||||||||||||
|
|
element |
|
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
Optimise |
existing |
Study of data provided is on. Part of the work |
|
|
|
|
|
|
|
|
|
|
||||||
|
Storm Water Drains |
is common with Waste water. Discussions on |
|
|
|
|
|
|
|
|
|
|
||||||||
|
DPR |
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
with Wabag to optimise working |
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Renewable Energy - |
Solar |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Solar |
Reduce energy bill |
In touch with Mr. Subba Rao. Some |
Motor |
details at |
summer |
|
|||||||||||||
|
information on Schematics and motor details |
storage |
tanks |
and |
Head |
|
||||||||||||||
|
|
|
|
|
sought. Awaited. |
|
|
|
water works provided. SLD |
|
||||||||||
|
Energy and Smart Grids |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Basic Concept ready for the standard |
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
33/11kV Distribution Station for converting |
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
Outdoor S/s to E-House (Space saving by 50% |
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
- balance part can be used as city open |
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
space). E- House concept can be presented |
Discussions |
|
|
|
and |
|
|||||||||
|
|
|
|
|
during |
|
next |
meeting |
at |
City. |
|
|
|
|
||||||
|
|
Reduction |
of |
|
presentation |
of |
proposals |
|
||||||||||||
|
|
|
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
|
|
with |
|
DE |
& |
ADE, |
|
AP |
|
|||||
|
|
footprint |
reduction |
For looped SCADA with integration to 132kV |
|
|
|
|||||||||||||
|
SS optimisation |
TRANSCO was held on 10th |
|
|||||||||||||||||
|
of |
maintenance/ |
Station |
and |
central |
server |
room. |
|
||||||||||||
|
|
Feb'2016.Recommendations |
|
|||||||||||||||||
|
|
losses |
|
|
|
|
|
|
|
|
||||||||||
|
|
|
Input |
required |
from City |
: Information |
to |
be |
made |
|
by |
|
the |
|
||||||
|
|
|
|
|
|
|
|
|||||||||||||
|
|
|
|
|
Consortium Team |
|
|
|
|
|||||||||||
|
|
|
|
|
requried is SLDs of existing Substations + |
|
|
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
inputs on existing protection system on |
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
communicable |
|
parameters. |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
Alignment with APDISCOM - requried |
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
Study visit of SIEMENS Team |
|
||||||||
|
|
|
|
|
Possibility of reduction of 1078Nos. |
along |
with |
Corporation |
|
|||||||||||
|
|
|
|
|
Distribution Transformers by 30% in phase |
Engineers, |
|
APTRANSCO |
|
|||||||||||
|
|
Reduction |
of |
manner to ease out trafic conjestion (narrow |
Engineers in Identified roads |
|
||||||||||||||
|
|
lanes obstructions) + change of these DTCs to |
to study |
rationalisation |
of |
|
||||||||||||||
|
|
footprint |
|
|
||||||||||||||||
|
Distribution |
|
Compact Substations with UG connections in |
Transformers |
& |
Change |
of |
|
||||||||||||
|
reduction |
of |
|
|||||||||||||||||
|
system |
main street area of the city(for smart look). |
Over |
Head Power |
lines |
to |
|
|||||||||||||
|
maintenance/ |
|
||||||||||||||||||
|
|
Input requried from City : Identification of |
Under |
Ground |
Cable |
was |
|
|||||||||||||
|
|
losses |
|
|
||||||||||||||||
|
|
|
Area required by Muncipal corporation to do |
made |
on |
10th |
Feb'2016. |
|
||||||||||||
|
|
|
|
|
|
|||||||||||||||
|
|
|
|
|
this and survey on DTCs to be carried out by |
Recommendations |
to |
be |
|
|||||||||||
|
|
|
|
|
next week. |
|
|
|
made |
by |
the |
Consortium |
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
Team |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Swachhandhra:
- Individual Household Toilets and Community Toilets are taken up for improving sanitation coverage.
IEC activities and Public participation efforts are taken up for promoting behavior change.
- Desilting of drains is taken up and Special Sanitation Drive to up keep canal bunds and public places is taken up.
Amrut:
Service level improvement plan (SLIPs) prepared.
- Government approved 2.78 Cr for SAAP 2015-16 to improve water supply service connection coverage and for creation of Park at Postal Colony.
- Detailed Project Reports for Storm Water Drainage and Sewerage System with Decentralized STPs are submitted to Government for sanction during ensuing mission period 2016-2020 and the details are as
Smart Wards:
10 divisions (20%) were identified for smart divisions.
- Adopted partnership with interested partners in activities of green space development, water harvesting.
Urban Planning:
- Proposals for Helapuri Urban Development Authority (HUDA) : The Eluru has been upgraded to Municipal Corporation on 09.04.2005. The Municipal Council vide CR.No: 54/29.10.2015 has requested the government to include areas covered under the surrounding 11 grampanchayats to form Helapuri Urban Development Authority for better utilization of resources and to ensure integrated and comprehensive planning for development in and around Eluru. The District Collector has also recommended the proposal for consideration of Government. The main objectives of creating Helapuri Urban Development Authority is
- To curb speculative land dealings in the Development Authority area in order to prevent unplanned and haphazard Growth.
- To promote planned development integrated with industrial development for achieving the objective of dispersal of population and economic activities.
- To provide for low density development with regional level institutional and recreational activities aiming to serve the entire region.
- Expression of Interest from planning firms for conducting GIS based comprehensive planning for Eluru City and 11 Satellite Panchayats is invited.
- The APMDP awarded the work of consultancy for preparation of GIS Base Map for Eluru City to M/s Aarvee Associates, Hyderabad. However the progress achieved by the firm is not satisfactory and the defects noticed in layers of base map are not rectified till now.
Urban Poverty Alleviation Activities:
|
Total No of SHGs |
- |
2,998 |
|
|
Total No of SHG Members |
- |
28,828 |
|
|
|
No of SLFs |
- |
78 |
|
|
No of TLF |
- |
1 |
New initiatives to be taken up by SHG Women at Eluru:
Establishment of Generic Medical Stores
- Proposed to plan Tailoring Production Centre with 200 SHG Women under one roof for creating self employment.
Establishment of Swasakthi Canteen at Municipal Corporation, Eluru
Establishment of Nutrition centers for school children
Establishment of sanitary napkins Group Unit by SHGs
Urban Reforms:
- Eluru Municipal Corporation has implemented certain urban reforms as per the directions of Government of Andhra Pradesh and they are as follows
Online issue of building permissions
Online issue of E-Certificate of Birth & Death
Creation of Website : elurucorporation.org
Publication of E-news letter
Adopting E-procurement,
Adopting Double Entry Accounting
Adopting ERP solutions for Tax Collection
- Action plan for certain other reforms is prepared in compliance with AMRUT guidelines as per the implementation time line fixed by the government.
Pending Issues at Government level:
- Remodeling of UGD system in I-town is sanctioned by Government for Rs. 17.30 Cr vide Go.Ms.No: 150MA&UD, dt: 21.02.2009 and entrusted to Contract Agency on EPC. However the project was held up due to contractual issues and non release of funds. A revised proposal for Rs. 31.70 Cr was submitted to Government through the Engineer – In – Chief, Public Health. Revised sanction awaited.
- Proposal for formation of Helapuri Urban Development Authority (HUDA) with 11 Gram Panchayats and Eluru City is submitted to Government with CR.No: 54/29.10.2015 duly recommended by the District Collector. Sanction awaited
Innovative actions by MCE:
- Renovation of Burial ground at Venkanna Cheruvu is taken up with public private partnership. The proposed project cost is Rs. 4.60 Cr. An amount of Rs. 66.00 Lakhs spent till now and an allocation of Rs. 1.00 Cr is made in 2015-16 budget.
- Widening of certain main roads for providing dividers, footpaths etc., is proposed. An allocation of Rs. 3.00 Cr is made in 2015-16 budget.
- Beautification of the city with parks, landscaping and greenery in traffic islands as per the recommendation of APUGBC is proposed. An allocation of Rs. 2.50 Cr is made in 2015-16 budget.